Healthy Lifestyle Coach

Technologies and Plans

Our Choices

To see a full breakdown of why we made certain choices, please look at the Tech Feasibility paper we have linked in our Documents page.


The technologies we are using are:



Plans

Here is a Gantt chart to show our plans for development. Mobile functionality is added as a separate color because we will discuss the feasibility of the mobile app with our client after we have implemented all other desired features.


Currently, we have already submitted our Requirements Document Final and will have all three of our planned tech demo prototypes ready. At the start of the spring semester, features will be rolled out at a much more consistent rate. Starting in the prototyping phase and continuing throughout the entire project, there will be an emphasis on accessibility and scalability.





Some plans changed during the second semester, so here is an updated schedule that was more closely followed during the Spring 2026 semester.