Our project is located on the South Campus of Northern Arizona University in Flagstaff, Arizona. The first image shows the approximate location on NAU Campus. The second image shows the area of interest for our project.
Figure 1: Location in Flagstaff, AZ
Figure 2: Area of Interest

FINAL DESIGN ALTERNATIVES
ROUNDABOUT |
PEDESTRIAN BRIDGE |
|---|---|
GANTT CHART


TABLE OF POSITIONS

BUDGET
