Project Gallery

Figure 1: Location of the implementation of the well
Figure 2: Aquired monitoring well components

Figure 3: Team members using 3-inches hand auger
Figure 4: Team member using 6-inches hand auger

Figure 5: 126 Inches augured hole

Figure 6: Team member holding hand auger with all extentions
Figure 7: Team member holding the assembled well
Figure 8: Team member using a pounder
Figure 9: Packing the monitoring well