RASC Mars Team 

The RASC Mars Project is a challenge sponsored by RASC-AL that aims to design a minimum Mars ascent vehicle. This MAV will carry two passengers, along with cargo, from the Martian surface to low Mars orbit. 

 

PROJECT DESCRIPTION 

Teams will develop a low-mass MAV system and mission concept that can deliver a crew of 2 from the surface of Mars to a low Mars orbit, with a dry mass limit of 5,000 kg and a wet mass limit of 20,000 kg. Teams should consider at least one of two cases for MAV deployment: a 5,000 kg dry system with subsequent propellant transfer on the surface (whether from Earth-delivered or Mars-derived propellant), and/or a 20,000 kg wet system ready for ascent upon landing. Teams do NOT need to develop an integrated Mars mission but instead must identify the necessary interfaces to support their MAV concept (e.g. what kind of vehicle is needed to deliver the crew from low Mars orbit back to their in-space transportation). Technology portfolios and system development timelines should realistically serve a mission date that is ready to land on Mars no later than December 31, 2034, with an annual budget of no more than $2 billion per year from 2025 to 2035. -RASC-AL Theme 2, Minimum Mars Ascent Vehicle.

 

MEET THE TEAM

 

160x160

Katrina Kittelsrud 

Mechanical Engineering

knk82@nau.edu 

 

160x160

Jacob Mettler 

Mechanical Engineering

jjm489@nau.edu 

160x160

Lexie Marquez 

Mechanical Engineering

lam649@nau.edu 

160x160

Peng Zhao 

Mechanical Engineering

pz47@nau.edu 

160x160

Zachary Small 

Mechanical Engineering

zds37@nau.edu 

PROJECT ADVISOR 

160x160

Dr. Sarah Oman 

Sarah.Oman@nau.edu